A submittal refers to the written and/or physical information provided by a responsible contractor (i.e., contractors and subs) to the general contractor. This information is submitted to the design team for approval of equipment, materials, etc. before they are fabricated and delivered to the project. Submittals can be presented in various formats, such as shop drawings, cut sheets on equipment, and material samples. Submittals are required primarily for the architect and engineer to verify that the correct products and quantities will be installed on the project in compliance with the design documents/contract documents.
Les livrables sont souvent créées par un chef de projet ou un entrepreneur (ou sous-traitant) pour demander des informations au sous-traitant responsable sur les éléments spécifiques prévus pour la fabrication ou l'installation sur un projet. Une fois que le sous-traitant a soumis les informations (par exemple, les données sur les matériaux, les données sur les produits, les échantillons de produits, les dessins d'atelier, etc.), les équipes de projet et de conception examinent les soumissions pour s'assurer que les informations sont conformes aux plans et devis du projet. Une fois approuvée, le livrable est retourné au sous-traitant, ce qui signifie que le travail (ou la fabrication) est approuvé pour la construction.
In Procore, an Approval Workflow designates the list of individuals who respond to submittals (for example, approve, reject, and so on.) in accordance with the rules that have been determined by the approval framework and approval process being used.